Precautions for LCD Video wall installation

Installation and commissioning steps of LCD Video Wall, what should be paid attention to in LCD video wall installation? Today, Layson will summarize some matters needing attention during installation.

LCD Video Wall is different from domestic TV sets. LCD Video Wall is mainly commercial, has significant and colorful functions, can be continuously applied 24 hours a day, and the application place is also very common.

Nowadays, the LCD video wall can be seen frequently, but because the seam of the LCD video wall is very narrow, it is very easy to be ignored by many people in the whole process of LCD video wall installation, which leads to difficult maintenance and reduced service life in the middle and later stages of the new project. How to install and assemble the LCD video wall of the display screen, Today, let’s summarize and share with you the small series of LCD video wall manufacturers.

LCD Video Wall installation

Precautions for LCD video wall installation

1. Determine the fixed method of LCD video wall, select floor support frame, server cabinet or wall mounted, and accurately measure the distance from the support frame to the rear wall;

2. The support frame must be firm. The load-carrying capacity shall be determined according to the specification and total number of LCD splicing screen, which is generally 1.5 times the net weight of the screen to ensure that it is firm at the front, rear, left and right.

3. After the support frame is installed, install the screen gradually. The installation sequence of the display screen is from left to right and from bottom to top. Adjust the gap between the screen and the screen to ensure the horizontal and vertical type as far as possible.

4. After the display screen is installed, the wiring is done. Generally, the middle of the LCD video wall is all controlled by the network cable, and each screen is connected in series with the network cable. The network cable of each screen should receive the serial port communication on the computer, so that all large screens can be manipulated.

5. Wiring method of power cord: each screen must be plugged into the power cord. Nowadays, HDM HD cable is widely used in the market. The power cord on the display screen is connected to the regulator or drainage matrix or multi screen display CPU, and then each display screen can display images.

6. After the adjustment link display screen is plugged in, it can adjust the display screen. According to the dialog box on the computer, each screen indicates the address code, assigns the geographical location of the display screen, and sends commands to it. Even if the display screen adjustment is completed.

In order to better achieve success in the implementation of a new LCD Video Wall project, the installation of technical specialty is very important. It can not only deal with the actual effect of all display screens and improve the visual impact, but also has great importance for the maintenance of display screens in the middle and later stages, equipment maintenance and service life.


Post time: Nov-29-2021